Operational experience on a grid connected 100 kWe biomass gasification power plant in Karnataka, India

Dasappa, S and Subbukrishna, DN and Suresh, KC and Paul, PJ and Prabhu, GS (2011) Operational experience on a grid connected 100 kWe biomass gasification power plant in Karnataka, India. In: Energy for Sustainable Development, 15 (3, SI). pp. 231-239.

[img] PDF
Operational.pdf - Published Version
Restricted to Registered users only

Download (858kB) | Request a copy
Official URL: http://dx.doi.org/10.1016/j.esd.2011.03.004

Abstract

The paper reports the operational experience from a 100 kWe gasification power plant connected to the grid in Karnataka. Biomass Energy for Rural India (BERI) is a program that implemented gasification based power generation with an installed capacity of 0.88 MWe distributed over three locations to meet the electrical energy needs in the district of Tumkur. The operation of one 100 kWe power plant was found unsatisfactory and not meeting the designed performance. The Indian Institute of Science, Bangalore, the technology developer, took the initiative to ensure the system operation, capacity building and prove the designed performance. The power plant connected to the grid consists of the IISc gasification system which includes reactor, cooling, cleaning system, fuel drier and water treatment system to meet the producer gas quality for an engine. The producer gas is used as a fuel in Cummins India Limited, GTA 855 G model, turbo charged engine and the power output is connected to the grid. The system has operated for over 1000 continuous hours, with only about 70 h of grid outages. The total biomass consumption for 1035 h of operation was 111 t at an average of 107 kg/h. Total energy generated was 80.6 MWh reducing over loot of CO(2) emissions. The overall specific fuel consumption was about 1.36 kg/kWh, amounting to an overall efficiency from biomass to electricity of about 18%. The present operations indicate that a maintenance schedule for the plant can be at the end of 1000 h. The results for another 1000 h of operation by the local team are also presented. (C) 2011 International Energy Initiative. Published by Elsevier Inc. All rights reserved.

Item Type: Journal Article
Publication: Energy for Sustainable Development
Publisher: Elsevier Science
Additional Information: Copyright of this article belongs to Elsevier Science.
Keywords: Distributed power generation;Grid connection;Biomass gasification system;Rural energy
Department/Centre: Division of Mechanical Sciences > Aerospace Engineering(Formerly Aeronautical Engineering)
Division of Mechanical Sciences > Centre for Sustainable Technologies (formerly ASTRA)
Date Deposited: 24 Nov 2011 05:58