ePrints@IIScePrints@IISc Home | About | Browse | Latest Additions | Advanced Search | Contact | Help

Browse by Author

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 2.

Journal Article

Malolan, S and Mathirajan, M and Tiwari, MK (2020) A methodology for determining the optimal reverse flow capacities and the breakeven period for a multi products-component remanufacturing problem of an OEM. In: Operations Management Research .

Malolan, S and Mathirajan, M (2018) Inventory and production planning for component remanufacturing in an original equipment manufacturer-closed loop supply chain. In: International Journal of Logistics Systems and Management, 29 (4). pp. 524-556.

This list was generated on Sat Apr 27 06:56:11 2024 IST.