Anbazhagan, P and Sheikh, Neaz M and Bajaj, Ketan and Dayana, Mariya PJ and Madhura, H and Reddy, GR (2017) Empirical models for the prediction of ground motion duration for intraplate earthquakes. In: JOURNAL OF SEISMOLOGY, 21 (4). pp. 1001-1021.
PDF
Jou_Sei_21-4_1001_2017.pdf - Published Version Restricted to Registered users only Download (4MB) | Request a copy |
Abstract
Many empirical relationships for the earthquake ground motion duration were developed for interplate region, whereas only a very limited number of empirical relationships exist for intraplate region. Also, the existing relationships were developed based mostly on the scaled recorded interplate earthquakes to represent intraplate earthquakes. To the author's knowledge, none of the existing relationships for the intraplate regions were developed using only the data from intraplate regions. Therefore, an attempt is made in this study to develop empirical predictive relationships of earthquake ground motion duration (i.e., significant and bracketed) with earthquake magnitude, hypocentral distance, and site conditions (i.e., rock and soil sites) using the data compiled from intraplate regions of Canada, Australia, Peninsular India, and the central and southern parts of the USA. The compiled earthquake ground motion data consists of 600 records with moment magnitudes ranging from 3.0 to 6.5 and hypocentral distances ranging from 4 to 1000 km. The non-linear mixed-effect (NLMEs) and logistic regression techniques (to account for zero duration) were used to fit predictive models to the duration data. The bracketed duration was found to be decreased with an increase in the hypocentral distance and increased with an increase in the magnitude of the earthquake. The significant duration was found to be increased with the increase in the magnitude and hypocentral distance of the earthquake. Both significant and bracketed durations were predicted higher in rock sites than in soil sites. The predictive relationships developed herein are compared with the existing relationships for interplate and intraplate regions. The developed relationship for bracketed duration predicts lower durations for rock and soil sites. However, the developed relationship for a significant duration predicts lower durations up to a certain distance and thereafter predicts higher durations compared to the existing relationships.
Item Type: | Journal Article |
---|---|
Publication: | JOURNAL OF SEISMOLOGY |
Additional Information: | Copy right for this article belongs to the SPRINGER, VAN GODEWIJCKSTRAAT 30, 3311 GZ DORDRECHT, NETHERLANDS |
Department/Centre: | Division of Mechanical Sciences > Civil Engineering |
Date Deposited: | 29 Jul 2017 10:05 |
Last Modified: | 05 Mar 2019 07:05 |
URI: | http://eprints.iisc.ac.in/id/eprint/57513 |
Actions (login required)
View Item |