ePrints@IIScePrints@IISc Home | About | Browse | Latest Additions | Advanced Search | Contact | Help

Evaluation of Charges for Power Transmission and Losses in Bilateral Power Contracts

Thukaram, D. and Vyjayanthi, C. (2008) Evaluation of Charges for Power Transmission and Losses in Bilateral Power Contracts. In: IEEE Region 10 Conference (TENCON 2008), NOV 19-21, 2008, Hyderabad, pp. 2224-2229.

[img] PDF
2full_text.pdf - Published Version
Restricted to Registered users only

Download (313kB) | Request a copy

Abstract

The paper presents a method for transmission loss charge allocation in deregulated power systems based on Relative Electrical Distance (RED) concept. Based on RED between the generator and load nodes and the predefined bilateral power contracts, charge evaluation is carried out. Generally through some power exchange mechanism a set of bilateral contracts are determined that facilitate bilateral agreements between the generation and distribution entities. In this paper the possible charges incurred in meeting loads like generation charge, transmission charge and charge due to losses are evaluated. Case studies have been carried out on a few practical equivalent systems. Due to space limitation results for a sample 5 bus system are presented considering ideal load/generation power contracts and deviated load/generation power contracts. Extensive numerical testing indicates that the proposed allocation scheme produces loss allocations that are appropriate and that behave in a physically reasonable manner.

Item Type: Conference Proceedings
Series.: TENCON-IEEE Region 10 Conference Proceedings
Publisher: IEEE
Additional Information: Copyright 2009 IEEE. Personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution to servers or lists, or to reuse any copyrighted component of this work in other works must be obtained from the IEEE.
Keywords: Bilateral Power contracts; Deregulated Power System; Relative Electrical Distance (RED); Supplementary charges; Transmission charges; Transmission loss allocation
Department/Centre: Division of Electrical Sciences > Electrical Engineering
Date Deposited: 17 Jul 2009 10:03
Last Modified: 19 Sep 2010 05:36
URI: http://eprints.iisc.ac.in/id/eprint/21152

Actions (login required)

View Item View Item